Trenchless vs. open-cut: the real cost comparison

The quote with the smaller number at the bottom is not always the cheaper job. Here is what sits inside each method's price, what routinely gets left out, and how to compare two quotes that are not describing the same amount of work.

Published September 21, 2026 by Freitas Plumbing Corp

Common questions

Is trenchless always more expensive than digging?

Per foot of pipe, yes. All in, frequently not. The deciding factor is what sits above the line: trenchless charges more for the pipe and almost nothing to restore the surface, while open-cut charges less for the pipe and the real money for the surface.

Why will nobody give me a price over the phone?

Because the things that set the price, the depth, the length, the material, the access, and the actual defect, cannot be known without surveying the line. A number given before that is a guess, and guesses get corrected upward once work starts.

Does a lined pipe last as long as a new one?

A cured-in-place liner is engineered for a fifty-year design life and is a jointless structural pipe in its own right. The failure modes that killed the original, root intrusion at joints, corrosion, offset connections, no longer apply because there are no joints left.

Should I get more than one quote?

Yes, and ask each for the camera footage. Two contractors looking at the same video and recommending different methods is a useful conversation. Two contractors who have not looked are just two guesses.

Next step

Start with footage.
Then decide what it needs.

Every Freitas job begins with a camera survey, because a five-figure repair decision should be made from evidence rather than from a guess at the cleanout. Tell us what the property is doing and we will take it from there.

  • Camera survey before any recommendation, every time
  • Written scope with each viable method priced side by side
  • Your own copy of the footage, whoever you hire
  • One licensed in-house crew, never subcontracted
Call now Book inspection